當(dāng)前位置: 首頁 > BEC商務(wù)英語 > BEC商務(wù)英語模擬試題 > 2021年BEC商務(wù)英語中級閱讀模擬練習(xí)(19)

2021年BEC商務(wù)英語中級閱讀模擬練習(xí)(19)

更新時間:2021-06-29 16:46:09 來源:環(huán)球網(wǎng)校 瀏覽15收藏3

BEC商務(wù)英語報名、考試、查分時間 免費短信提醒

地區(qū)

獲取驗證 立即預(yù)約

請?zhí)顚憟D片驗證碼后獲取短信驗證碼

看不清楚,換張圖片

免費獲取短信驗證碼

摘要 環(huán)球網(wǎng)校小編為了讓您更好地備考2021年BEC商務(wù)英語考試,為您整理了“2021年BEC商務(wù)英語中級閱讀模擬練習(xí)(19)”的內(nèi)容,希望能對您有所幫助。各位準(zhǔn)備參加2021年11月BEC商務(wù)英語考試的考生,請盡快抓緊時間進(jìn)行備考。
2021年BEC商務(wù)英語中級閱讀模擬練習(xí)(19)

編輯推薦:2021年BEC商務(wù)英語中級閱讀模擬練習(xí)匯總

免費預(yù)約短信提醒服務(wù)可以幫助各位考生更及時更準(zhǔn)確的掌握2021年11月BEC商務(wù)英語考試報名、考試時間等信息,以防您錯過!

2021年BEC商務(wù)英語中級閱讀模擬練習(xí)(19)

l Read this memorandum.

l Choose the best sentence from the list A – I to fill each of the blanks.

l For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.

l De not mark any letter twice.

l One answer has teen given as an example.

MEMORANDUM

To: Filma Williams, school of Architecture

From: Ram S. Johnson, Physical Plant Operations

Subject: Air-conditioning Installation Costs for East Hall.

Date: 4.4.94

As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in East Hall ____ Example ____

Office and Classroom installation

Estimates were obtained from three contractors on the costs of covering the offices and classrooms ____ 8 ____ The work would take about three weeks.

Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period ____ 9 ____ Sheet metal work to build out lest in the classes could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.

Arrangements were not made to do the office space installation on weekends … 10 …

Additional Installation

Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. ____ 11 ____ If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ____ 12 ____

Summary

The total job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.

Example: A

A. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.

B. All these three were in the $ 20,000 to $ 25,000 range.

C. This later installation would cost about $20,000.

D. However, class interruption should be minimal.

E. In the same way, each of these three would take at least one month.

F. Therefore, the total cost was this $6,000 plus another $5,000.

G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.

H. Each faculty member could expect to have workers in office for about one day.

I. So faculty members can continue their office work as usual.

參考答案:8.B 9. D 10. H 11. G 12. C

以上就是環(huán)球網(wǎng)校小編為您帶來的“2021年BEC商務(wù)英語中級閱讀模擬練習(xí)(19)”的全部內(nèi)容,同時小編為廣大考生整理更多2021年BEC商務(wù)英語考點、模擬練習(xí)等資料,可點擊右側(cè)更多資料按鈕后進(jìn)入下載頁面。

分享到: 編輯:謝曉英

資料下載 精選課程 老師直播 真題練習(xí)

BEC商務(wù)英語資格查詢

BEC商務(wù)英語歷年真題下載 更多

BEC商務(wù)英語每日一練 打卡日歷

0
累計打卡
0
打卡人數(shù)
去打卡

預(yù)計用時3分鐘

BEC商務(wù)英語各地入口
環(huán)球網(wǎng)校移動課堂APP 直播、聽課。職達(dá)未來!

安卓版

下載

iPhone版

下載

返回頂部